Stage 1 · Ingest

Source document package

Drop FDS, P&ID (piping), A&ID (air and ducting), door interlock schedule, topology, room book, and the master IC/OC protocols. Output follows the Daldrop SHELMEQ format.

Project identity
Headers, cover sheets, and filenames use these fields. Keep status at Draft until this revision is ready to send — generated files then drop the watermark.

Word and PDF files are stamped DRAFT until you mark them issued.

RevDateDescriptionBy
FDS
Required
SOO, door interlocks, setpoints, alarms

0 files

P&ID
Required
Piping tags, NC/NO, line sizes

0 files

A&ID
Required
CROFCU, FFU, boosters, CAV/VAV/VCD

0 files

Interlock
Optional
Door pairs, interlock groups

0 files

Topology
Optional
BACnet / Modbus, I/O trunks

0 files

Room Book
Optional
Rooms, ISO class, coordinates

0 files

Master IC/OC
Optional
Template, acceptance wording

0 files

FDS, P&ID (piping), and A&ID (air and ducting) are required before extraction. Add the door interlock schedule when the job has one.

Client, project, IC number, and OC number are required before extraction.

Strict grounding: downstream IC/OC tables will not include a tag that lacks a source document page or sheet reference.